|
|
|
| Oversized Mine Construction Organization Optimization Design Feasibility Stuby |
| ZHANG Jian-feng |
| Shijiazhuang Design and Research Institute of Coal Industry, Shijiazhuang 050051 , China |
|
|
|
|
Abstract Construction organization design was an important technology to organize and guide the mine construction ocuments scientifically, which was the bridge of communication design and construction. Hami No.1 mine was an versized (12.00 Mt/a) and new mine. Through scientific construction organization as a whole, safe and efficient onstruction was achieved. The construction provided experience for similar mine construction site management, construction management and the safety in production.
|
|
|
|
|
|
| [ 1 ] 范聚朝,邹广泉. 推行项目法管理 高速优质建设矿井.建井技 术. 2000,(21)4: 39 - 42.[ 2 ] 韩晓东, 张 馨. 朝阳矿副井基岩段快速施工[A]. 全国矿山建 设学术会议论文选集(上册)[C],2003.[ 3 ] 史万红, 罗 健. 浅谈钢筋混凝土工程中常见的质量问题与防 治措施 [ J ]. 煤炭工程,2008, (4):33 - 35. |
|
|
|