|
|
|
| Based on ANSYS Workbench New Filling Bracket Analysis |
| YAN Qing-guo,LONG Chao |
| Xingdong Mine, JIzhong Energy Group Corporation Ltd., Xingtai, 054001 China |
|
|
|
|
Abstract The thesis took new high water filling bracket as research object and employed ANSYS Workbench software to conduct new stent design finite element strength analysis, providing the basis for new bracket strength.
|
|
|
|
|
|
| [ 1 ] 吴 震,王 颖. 基于ANSYS Workbench液压支架整架有限元分析 [ J ] .煤矿机械,2009,30(9 ):106 - 108.[ 2 ] 马福泉,王 晶,孙 博, 等. ZY5000-15-30液压支架有限元静力分析 [ J ].煤矿机械,2011,32(5):95 - 96.[ 3 ] 中华人民共和国煤炭行业标准. MT312—2000液压支架通用技术条件 [ S ].北京:煤炭工业出版社,2001.[ 4 ] 何文斌,李菊丽,李立伟. ANSYS在液压支架优化设计中的应用 [ J ].机械设计与制造,2007(6 ):170 - 173.[ 5 ] 王国法. 液压支架技术 [ M ].北京:煤炭工业出版社,1999.[ 6 ] 赵玉泉.高水材料包式充填支架的研究与运用 [ J ] .河北煤炭,2010(6 ):41 - 42.[ 7 ] 杨汝静,王爱英. ZFD2000/21/28综放支架顶梁改造 [ J ].河北煤炭,2004(6 )16 - 17. |
|
|
|