| High Gas Sealing Strata Grouting Technology in Vestical Shaft Construction |
| LI Hu,WANG Yun-chao |
| Shanxi Hongxia First Construction Corporation Ltd., Yangquan Mining Industry Group, Yangquan, 045000 China |
|
|
|
|
Abstract Crossing high gas strata was constantly encountered in vertical shaft construction. The traditional method to solve this problem was to adopt the drainage or drilling relief release, which not only long time dealing with the gas, but also getting poor gas drainage influenced by shaft hydrops. Shanxi Hongxia First Construction Corporation adopted K3 high pressure grouting permeability fractured curing blocking gas in shaft construction. The process was simple, with processing gas in short time, providing a new way for the vertical shaft crossing the high gas.
|
|
|
|
|
|
| [1 ] 俞启香.矿井瓦斯防治[M ]. 北京:煤炭工业出版社,1992.[2 ] 胡殿明,林柏泉. 煤层瓦斯赋存规律及防治技优[M ]. 徐州:中国矿业大学出版社,2006.[3 ] 国家安全生产监督管理总局,国家煤矿安全监察局.煤矿安全规程[M ]. 北京:煤炭工业出版社,2010. |
|
|
|