| Design and construction of waterproof gate chamber under complex geological conditions in Dongpang Mine |
| Li Shanwen |
| Jizhong Energy Xingtai Mining Industry Group Co., Ltd., Xingtai 054000, China |
|
|
|
|
Abstract As a common technical means for mine water disaster prevention, the waterproof gate can realize the isolation of the flooded area in the case of water inrush and minimize the loss. In order to realize the partition isolation of No.2 coal and No.6 coal in the second coal extension area of Dongpang Mine, it was proposed to set up waterproof gate wall. Combined with the geological production conditions of No.6 coal, the waterproof pressure was determined to be 1.8 MPa, and the inverted conical structure that could withstand large water pressure was selected. The parameters such as the length and embedding depth of the waterproof gate wall were calculated. The construction process of waterproof gate wall was put forward, including chamber construction, post-wall grouting and pressure test. The water injection pressure test showed that the total water leakage of the gate wall after 24 h was 3.1 m3 / h, which met the relevant regulations.
|
|
|
|
|
|
| [ 1 ] 刘光杰. 地下防水闸门硐室结构与围岩相互作用研究[ D ]. 徐州:中国矿业大学,2022.
[ 2 ] 左雁群. 在极复杂条件下防水闸门硐室的设置与施工[ J ]. 煤矿开采,2007,12( 4 ):70 - 71,83.
[ 3 ] 王红建,费小保. 深井防水闸门硐室支护技术研究[ J ]. 能源技术与管理,2013,38( 2 ):61 - 62.
[ 4 ] 中华人民共和国应急管理部. 煤矿安全规程[ M ]. 北京:应急管理部出版社,2025.
[ 5 ] 何峰华. 煤矿防水闸门设计研究[ J ]. 煤炭工程,2018,50( 6 ):37 - 39,43.
[ 6 ] 袁世冲,李 强,杭 远,等. 深部矿山高承压应急防水闸门设计计算与数值模拟研究———以滇东北毛坪铅锌矿为例[ J ]. 工程地质学报,2024,32( 2 ):632 - 644.
[ 7 ] 祝仰奎. 6.0MPa 高压防水闸门壁后注浆及注水耐压试验[ J ]. 山东煤炭科技,2018,( 4 ):176 - 178.
[ 8 ] 李翔宇,王如猛. 煤矿高承压水下双向防水闸门自动控制技术研究与硐室设计[ J ]. 煤矿机械,2021,42( 12 ):23 - 25.
[ 9 ] 王文忠. 高水压矿山井下防水闸门硐室设计探讨[ J ]. 中国矿山工程,2024,53( 4 ):83 - 86.
[ 10 ] 闫建国,张照伟,胡成军. 梧桐庄煤矿井下突水隔断工程设置分析[ J ]. 煤炭与化工,2015,38( 7 ):85 - 88.
[ 11 ] 隋旺华,杭 远. 煤矿水闸墙设计施工技术综述与展望[ J ]. 煤炭科学技术,2016,44( 8 ):7 - 13,34. |
|
|
|