| Study on the development law of microseismic events in working face before and after hydraulic fracturing |
| Yang Bo1,2,3, Zhou Jinyan1,2,3, Wang Guoju1,2,3 |
| 1. Hebei Coal Research Institute Co., Ltd.,Xingtai 054000, China; 2. Key Laboratory of Mine Water Disaster Detection and Prevention and Control, Xingtai 054000, China; 3. Hebei Key Laboratory of Mine Microseismicity, Xingtai 054000, China |
|
|
|
|
Abstract With the increase of mining depth and gas content in coal mine, roadway layout and surrounding rock geological conditions were becoming more and more complex. Deformation was easy to occur, and safety problems were more prominent. At this time, hydraulic fracturing and other methods could be used to cut off and weaken the suspended roof structure and reduce the stope pressure. The comparative analysis of the roadway before and after hydraulic fracturing was carried out, and the development characteristics of microseismic events in the working face were analyzed in depth. After fracturing, the activity of the roof event was enhanced, the activity of the floor was weakened, and the plane distribution was more dispersed and the distribution range was wider after fracturing. After fracturing, the fracture range of the overlying surrounding rock increased, the pressure conduction was smooth, and the pressure relief near the coal seam was obvious. The proportion of events near coal seam under the coal seam floor in 0-5 m increased by 53.5 %, the maximum disturbance depth of the floor decreased by 16.7 %, and there was no event development below Benxi limestone. Combined with microseismic data and field feedback, after fracturing, the pressure period of the working face became shorter, the step distance became smaller, the proportion of events with energy value greater than 5 000 J after fracturing decreased, and the vertical distribution changed from centralized to decentralized. The stress release in the stope was soothing, the dynamic pressure hazard was reduced, and the roadway deformation was effectively alleviated, which provided a guarantee for the safe mining of the working face.
|
|
|
|
|
|
| [ 1 ] 姜 光,解洪鑫,赵 毅,等. 定向组合水力压裂卸压技术在宋新庄煤矿的应用[ J ]. 煤炭技术,2023,42( 4 ):148 - 153.
[ 2 ] 杨洪增. 坚硬顶板水力压裂切顶卸压技术实践[ J ]. 煤炭与化工,2023,46( 1 ):21 - 24.
[ 3 ] 张百胜,王朋飞,崔守清,等. 大采高小煤柱沿空掘巷水力压裂围岩控制技术[ J ]. 煤炭学报,2021,46( 7 ):2 254 - 2 267.
[ 4 ] 牛同会. 分段水力压裂弱化采场坚硬顶板围岩控制技术研究[ J ]. 煤炭科学技术,2022,50( 8 ):50 - 59.
[ 5 ] 王 宁,王世斌,李树刚,等. 基于微震监测的水力压裂无煤柱自成巷开采覆岩运移周期性演化机理验证[ J ]. 煤炭工程,2021,53( 8 ):125 - 129.
[ 6 ] 张 懿. 厚煤硬顶巷道水力压裂模拟研究及效果分析[ J ]. 科学技术创新,2022( 17 ):40 - 43.
[ 7 ] 秦 毅. 煤层水力压裂裂缝扩展演化特征及瓦斯渗流规律研究[ J ]. 山西化工,2022,42( 2 ):98 - 100.
[ 8 ] 许延春,张二蒙,马子民,等. 预裂爆破切顶对底板破坏深度及矿压影响规律[ J ]. 煤炭工程,2021,53( 6 ):101 - 106.
[ 9 ] 张爱华,陈建东. 微震监测地质异常对工作面回采影响分析[ J ]. 煤炭与化工,2021,44( 12 ):40 - 43.
[ 10 ] 李修冠,张向阳,张 懿,等. 坚硬顶板特厚煤层初采初放卸压控制及回采率分析研究[ J ]. 矿业研究与开发,2022,42( 6 ):20 - 28. |
|
|
|