|
|
|
| Shearer cutting unit torque shaft structure design and optimization |
| Chai Chaoshuai |
| Shanxi Coking Coal Xishan Coal Electricity Xiegou Mine,Lvliang 033602, China |
|
|
|
|
Abstract Based on the torque shaft of MG900 / 2210-GWD shearer cutting unit in Xiegou Coal Mine, the influence of U-shaped structure unloading groove, V-shaped structure unloading groove and I-shaped structure unloading groove on the static strength of torque shaft was analyzed by using ANSYS finite element simulation software. The results show that the stress concentration distribution of the U-shaped structure unloading groove is relatively uniform, and the value is suitable, which can meet the application requirements. Compared with the V-shaped and I-shaped structure unloading groove, it can better play the role of transmission and overload protection. It is an ideal structural form of the torque shaft of the shearer cutting unit. The research results provide a reference for the design of torque shaft of shearer cutting unit in similar situations.
|
|
|
|
|
|
| [ 1 ] 梁 广. 对采煤机截割部扭矩轴的改进研究[ J ]. 山西焦煤科技,2017,41( 6 ):54 - 56.
[ 2 ] 靳立红,刘春生. 基于ADAMS采煤机截割部弹性扭矩轴动态特性研究[ J ]. 煤矿机械,2011,32( 8 ):47 - 49.
[ 3 ] 杨 周,姜 超,张义民,等. 采煤机截割部扭矩轴的动态可靠性分析[ J ]. 东北大学学报(自然科学版),2020,41( 2 ):217 - 222.
[ 4 ] 冷晓慧,杨兆建,王义亮. 采煤机扭矩轴卸荷槽尺寸参数化设计[ J ]. 煤炭技术,2015( 3 ):239 - 241.
[ 5 ] 王 帅. 矿井采煤机截割部U型槽扭矩轴结构优化设计研究[ J ]. 机械管理开发,2021,36( 9 ):8 - 9,32. |
|
|
|