| Optimization of pressure relief parameters of pre-cut roof in adjacent roadway blasting |
| Peng Shilong, Sun Lihui, Xiong Huaixin, Ding Bin |
| College of Mining and Surveying Engineering, Hebei University of Engineering, Handan 056038, China |
|
|
|
|
Abstract Roof cutting parameter is the key to the success of goaf tunneling under the condition of thick and hard roof, and the variation of parameters affects the stability of roadway surrounding rock. In this paper, No.19101 Face of Yunjialing Mine was taken as the engineering background, 5°, 10°, 15°, 20° four angles and 5 m, 9 m, 11 m, 13 m four different cutting top height scheme were designed by UDEC numerical simulation. The variation law of roof subsidence with different cutting angles and heights was analyzed, and the optimal parameters of cutting height and cutting angle were 11m and 10° respectively. The field blasting test showed that the optimum blasting hole distance was 600 mm.
|
|
|
|
|
|
| [ 1 ] 陆士良. 无煤柱区段巷道的矿压显现及适用性的研矿业学院学报,1980( 4 ):4 - 25.
[ 2 ] 郝瑞清. 长壁工作面顺槽煤柱合理留设尺寸的确定[ J ]. 山西焦煤科技,2012,36( 10 ):20 - 22.
[ 3 ] 康红普,张 晓,王东攀,等. 无煤柱开采围岩控制技术及应用[ J ]. 煤炭学报,2022,47( 1 ):16 - 44.
[ 4 ] 涂 敏,林远东,张向阳,等. 大空间孤岛采场覆岩结构演化与区段煤柱合理宽度研究[ J ]. 采矿与安全工程学报,2021,38( 5 ):857 - 865.
[ 5 ] 何文瑞,何富连,陈冬冬,等. 坚硬厚基本顶特厚煤层综放沿空掘巷煤柱宽度与围岩控制[ J ]. 采矿与安全工程学报,2020,37( 2 ):349 - 358,365.
[ 6 ] 赵 宾,王方田,梁宁宁,等. 高应力综放面区段煤柱合理宽度与控制技术[ J ]. 采矿与安全工程学报,2018,35( 1 ):19 - 26.
[ 7 ] 王德超,王 琦,李术才,等. 深井综放沿空掘巷围岩变形破坏机制及控制对策[ J ]. 采矿与安全工程学报,2014,31( 5 ):665 - 673.
[ 8 ] 侯圣权,靖洪文,杨大林. 动压沿空双巷围岩破坏演化规律的试验研究[ J ]. 岩土工程学报,2011,33( 2 ):265 - 268. |
|
|
|