|
|
|
| Cause analysis and treatment technology of water stop casing fracture accident in water exploration and drainage grouting reinforcement drilling hole |
| Cai Yachao, Guo Haishu |
| Gequan Mine, Jizhong Energy Resources Group Co., Ltd., Xingtai 054000, China |
|
|
|
|
Abstract Taking Gequan Mine as the research object, this paper expounded the technological structure of water stop casing and the causes of casing fracture accidents caused by grouting reinforcement drilling hole in the aquifer of lower coal seam floor mining under pressure in coal mine. Combined with the cases and control process of drilling hole casing accidents with different water outflow conditions and influence ranges, this paper discussed the application and feasibility of water control technology under three-diameter water stop casing, shallow hole grouting water control at the water outflow point around the borehole, silicate modified polyurethane material (chemical slurry) grouting water control technology, which provided technical experience for rapid and efficient casing fracture accident treatment and mine safety production.
|
|
|
|
|
|
| [ 1 ] 王永全. 钻探技术在煤矿水害防治工作中的应用[ J ]. 探矿工程:岩土钻掘工程,2017( 11 ):35 - 41.
[ 2 ] 姬乃强. 煤矿水害防治工作中钻探技术的应用研究[ J ]. 中小企业管理与科技,2019( 1 ):132 - 133.
[ 3 ] 牛上锋. 加强煤矿防治水工作的对策探析[ J ]. 能源与节能,2018( 1 ):85 - 86. |
|
|
|