|
|
|
| Study on surrounding rock deformation of hard roof cutting and roadway retaining by filling in Tenghui Mine |
| Yang Peng |
| Tenghui Coal Industry Co., Ltd, Huozhou Coal Electricity Group, Linfen 041000, China |
|
|
|
|
Abstract In order to solve the problem of the great influence on surrounding rock deformation by the hard roof, and taking No. 2202 Face of Tenghui Mine as the engineering background, the stress and strain of roof cutting and pressure relief filling body were studied using the numerical simulation software. The feasibility of roof cutting and pressure relief was verified by comparing the stress values of filling body before and after roof cutting. The stress and strain of surrounding rock under different roof cutting angles and different roof cutting and pressure relief heights were analyzed, and the optimum cutting angle was 30 °, the optimum height of top cutting was 10m. It provided a certain reference for roof cutting and pressure relief.
|
|
|
|
|
|
| 1 ] 郝跃清. 杉木树煤矿切顶卸压沿空成巷无煤柱开采技术应
用[ J ]. 当代化工研究,2021( 12 ):94 - 95.
[ 2 ] 黄克军,胡俊峰,蔚保宁,等. 6 m巷高综放工作面切顶留巷关键技术[ J ]. 煤矿安全,2021,52( 6 ):136 - 142.
[ 3 ] 田泽伟. 自燃煤层切顶卸压留巷工作面通风技术分析[ J ]. 能
源技术与管理,2021,46( 3 ):82 - 84.
[ 4 ] 李晓鹏. 兰花宝欣煤业切顶卸压沿空留巷技术研究与应用[ J ]. 山东煤炭科技,2021,39( 5 ):60 - 62.
[ 5 ] 毛国力,张 镇. 坚硬顶板巷内切顶留巷与密闭技术的研究与应用[ J ]. 煤炭技术,2015,34( 9 ):89 - 92. |
|
|
|