| Application of narrow coal pillar gob-side entry technology in isolated working face |
| Chen Peng |
| Shanxi Coking Coal Group Zhengli Coal Corporation Ltd., Lvliang 033000, China |
|
|
|
|
Abstract Zhengli coal industry 14-1105 isolated island working face retrieval roadway with support difficulties, through theoretical analysis and calculation, numerical simulation, field application and other methods, the design of 6.0 m small coal column technology was adopted, according to the force and surrounding rock damage characteristics, a new roadway surrounding rock multi-ring layer efficient support technology was used, with detailed support parameters, field application showed that during the mining period, there was basically no obvious displacement of the surrounding rock, and the maximum displacement of the top and bottom was 0.28 ~ 0.33 m and the maximum displacement of the two sides was 0.17 ~ 0.21 m during the workface recovery period, and the surface deformation was within a reasonable and controllable range.
|
|
|
|
|
|
| [ 1 ] 孙 浩. 厚煤层孤岛工作面综放沿空掘巷安全保障体系[ J ]. 煤矿安全,2019,50( 1 ):245 - 248.
[ 2 ] 刘 疆. 沿空掘巷煤柱宽度尺寸的确定及加固技术探讨[ J ]. 内蒙古煤炭经济,2019( 1 ):50,19.
[ 3 ] 陈平原,李景润. 深井高应力极软煤层沿空掘进围岩控制[ J ]. 内蒙古煤炭经济,2018( 24 ):41 - 43.
[ 4 ] 程 蓬,马晨晶,何 杰,等. 深部沿空掘巷巷道围岩应力状态及现场实测分析[ J ]. 煤矿开采,2018,23
( 6 ):45 - 48. |
|
|
|