|
|
|
| Stability control support technology for large span roof in crossover roadway |
| Ren Ruiping |
| Wanli No. 1 Mine, Shenhua Baotou Energy Corporation Ltd., Erdos 017000, China |
|
|
|
|
Abstract In view of the problem that the 42301 working face cut-hole roadway and its auxiliary transport chute were arranged in a cross-over roadway, the exposed area of the roof slab was large, the horizontal laminae and mud cement structure of the roof slab were obvious, and the support difficulty obviously increased, based on the general analysis of engineering, through numerical simulation, the stress damage characteristics of the surrounding rock in the cross-over roadway at the end of the 42301 working face were revealed. The engineering practice shows that the sinkage of the surrounding rock of crossover roadway was 150~185 mm, and the deformation of the surrounding rock of both sides was 100~160 mm, the current support effect meets the production safety requirements for the preparation of the working face recovery, and the active joint support design scheme was proposed for the crossover roadway, with safe and stable control effect.
|
|
|
|
|
|
| 1 ] 刘占军. 深井巷道群扰动性的FLAC3D的分析[ J ]. 煤炭与化工,2021,44( 4 ):21 - 24,27.
[ 2 ] 刘志恒. 大断面非等高巷道交岔点围岩控制研究[ D ]. 徐州:中国矿业大学,2019.
[ 3 ] 张晶晶. 破碎巷道交岔点锚网索注支护方法研究[ J ]. 煤炭与化工,2017,40( 8 ):47 - 49.
[ 4 ] 王 鹏. 高河煤矿大断面巷帮破碎围岩巷道的支护技术研究[ J ]. 煤炭与化工,2018,41( 5 ):33 - 35,48.
[ 5 ] 王 波,杨张杰,杨永刚,等. 大断面石门交岔点差异化支护技术研究[ J ]. 煤炭科学技术,2017,45( 2 ):51 - 58.
[ 6 ] 李 鹏. 复采动压扰动下巷道交岔点围岩力学响应及控制分析[ J ]. 煤矿开采,2016,21( 6 ):49 - 53.
[ 7 ] 何晓升,刘珂铭,张 磊,等. 极软岩巷道交岔点钢管混凝土支架结构设计与应用[ J ]. 煤炭学报,2015,40( 9 ):2 040 - 2 048.
[ 8 ] 张德稳. 深部软岩巷道大断面交岔点变形机理及控制对策[ J ]. 煤炭科技,2015( 2 ):52 - 53.
[ 9 ] 赵维生,韩立军,赵周能,等. 主应力对巷道交岔点围岩稳定性影响研究[ J ]. 岩土力学,2015,36( 6 ):1 752 - 1 760.
[ 10 ] 赵维生,韩立军,张益东. 垂直交岔点扰动主应力变化规律及围岩稳定性研究[ J ]. 采矿与安全工程学报,2015,32( 1 ):90 - 98.
[ 11 ] 杨永杰. 大断面Y型拱形巷道交岔点稳定性分析[ D ]. 包头:内蒙古科技大学,2014.
[ 12 ] 王 炯,孙晓明,郝育喜,等. 深井大断面交岔点变形机理及稳定性控制研究[ J ]. 煤炭科学技术,2014,42( 5 ):13 - 16. |
|
|
|