|
Abstract Liangbei Mine drainage system drilling project was taken as an example, the drilling, anti-slope, slope correction, casing and cementing techniques applicable to the construction of drainage boreholes in mines were proposed and implemented. The results showed that the technology was effective in managing flooding in the Liangbei Mine, providing a feasible and practical construction solution for mines to manage flooding and drainage.
|