| Application of medium and long probing water discharge borehole in Changgou Mine 15110 working face |
| Zhang Hu, Yang Yongwei, Wang Jingjing |
| Changgou Mine Corporation Ltd., Yangquan Mining Group, Jinzhong 045400, China |
|
|
|
|
Abstract Water damage is one of the five major natural disasters of coal mines, which seriously restricts the safety of coal production. In the west of Changgou Mine 15110 working face, with goaf detected by surface three dimensional earthquake and water accumulation anomaly area detected by surface electric prospecting in No. 15 coal seam, there were two positive fault structures between the physical anomaly area and the face, and the water conductivity of the fault was unknown, which caused great safety hazards to the 15110 face recovery work. In order to eliminate the potential water damage and ensure that no water accident, two medium-length water release boreholes were constructed in the inlet roadway of the 15110 working face.
|
|
|
|
|
|
| [ 1 ] 张振国. 长钻孔定向探放矿井采空积水技术在竹林山煤矿的应用[ J ]. 能源技术与管理,2019,44( 3 ):118 - 119.
[ 2 ] 张世平. 王家庄煤矿老空区积水综合探放技术的应用[ J ]. 煤矿现代化,2015( 3 ):56 - 57.
[ 3 ] 方 俊,陆 军,张幼振,等. 定向长钻孔精确探放矿井老空水技术及其应用[ J ]. 煤田地质与勘探,2015,43( 2 ):101 - 105. |
|
|
|