|
|
|
| Construction and application of early warning and control system for mine water hazard in Hebei Province |
| Liu Fangliang1, Liu Jia2 |
1. Hebei Coal Mine Safety Supervision Bureau, Shijiazhuang 050000, China;
2. Hebei Coalfield Geological Survey Institute, Xingtai 054000, China |
|
|
|
|
Abstract The background, general thinking and construction of the development of the early warning and control system for water hazard risk in coal mines in Hebei Province were summarized, the main practical effects of the system application were introduced, and the direction of further optimization and improvement was pointed out.
|
|
|
|
|
|
| [ 1 ] 尹尚先,连会青,刘德民,等. 华北型煤田岩溶陷落柱研究70年:成因·机理·防治[ J ]. 煤炭科学技术,2019,47( 11 ):1 - 29.
[ 2 ] 赵庆彪,赵兵文,付永刚,等. 大采深矿井地面区域治理奥灰水害关键技术研究[ J ]. 煤炭科学技术,2016,44( 8 ):
14 - 20.
[ 3 ] 刘德民,尹尚先,连会青,等. 煤矿底板突水定量预警准则
及预警系统研究[ J ]. 煤炭工程,2019,51( 4 ):16 - 20. |
|
|
|