|
Abstract The prediction of water inflow is an important part of the mining water prevention and control work. However, when the mine is divided into multiple mining sections, the general method cannot accurately predict the mine water inflow. Nanshan Mine in Hegang Mining Area was taken as an example, this paper combined the mining plan of the sub-section of the mine to dynamically predict the mine water inflow, and provided a basis for the mine to establish the drainage system of the mining area and formulate water prevention measures in each mining area.
|