Abstract The moving from 2129 drainage roadway to the return air inclined shaft No. 39 wasted rock roadway by EBZ-160 cantilever roadheader mining machine in Xingdong Mine was taken as an example. Through analyzing the EBZ-160 cantilever roadheader dismantling process, six kinds of schemes were adopted to realize the zero input of the roadheader from dismantling to installation, and provide experience and technical support for the mine EBZ-160 cantilever roadheader moving process without economic input.
|