|
Abstract In order to avoid the effect of the inflow of water in the goaf on the recovery mining of the 104 working face. For the first time during the mining face, the water in the goaf was removed by the drainage holes in the adjacent roadway construction in the working face. The high production, efficient and safe recovery was realized, which provided the theoretical basis and practical experience for the future water control work under similar condition.
|