|
Abstract Pangpangta Mine ventilation system was taken as study object and was measured, with large windage resistance, air leakage, multiple ventilation equipments and poor balance of mining area, combined with the ventilation condition of the mine, 3 optimized plans were set up, the most optimized plan was chosen after comparing, providing reference for ventilation system upgrading.
|