Abstract: In view of the problems existing in the supporting form of the tunneling process of the roadheader equipped with the pneumatic anchor drilling machine currently used in Tiexin Coal Industry, in order to improve the efficiency and quality of coal mine tunneling, taking the 2301 material roadway tunneling face of Tiexin Coal Mine as a case, combined with its actual needs, the intelligent system transformation of the roadway is carried out. From the aspects of process equipment matching, tunneling, transportation, auxiliary production, monitoring and monitoring, the intelligent tunneling system suitable for the 2301 material roadway of Tiexin Coal Mine is selected and designed. Practice shows that the intelligent tunneling system scheme designed in this paper has achieved good application results, solved the problems of mining imbalance and low tunneling efficiency in Tiexin Coal Mine, and improved the degree of intelligence.
杜 伟. 铁新煤矿智能掘进系统建设方案分析[J]. 煤炭与化工, 2023, 46(10): 97-101.
Du Wei. Analysis on construction scheme of intelligent tunneling system in Xintie Coal Mine. CCI, 2023, 46(10): 97-101.