Based on large thickness and low strength of No. 3 coal seam, with joint and fracture development, large section of working face, subsidence of roof roadway along floor, mining roadway along roof was adopted, based on the analysis of ground stress, the support along roof was put forward according to dynamic information design, the practice showed that the technology met the needs of control of surrounding rock, with less obvious deformation of surrounding rock along roof.
焦 璐. 长平矿大采高工作面沿顶巷道支护设计研究[J]. 煤炭与化工, 2016, 39(8): 112-113,115,121.
Jiao Lu. Study on support design of large mining height working face along roof roadway in Changping Mine. CCI, 2016, 39(8): 112-113,115,121.