In order to form the ventilation system as soon as possible and reduce ventilation system of No.11 mining area in Xiandewang Mine, blasting mining was conducted in concentrated transportation roadway. To improve mining rate and reduce the loss of coal resources, cushion warehouse with 3 t bottom-dump mining car was used to transport coal and material, the transportation system was optimized. The application on the site showed that the optimized transportation system with high efficiency, reduced the transportation accident rate.
王旭辉. 半煤岩巷炮掘施工中运输系统的优化[J]. 煤炭与化工, 2016, 39(4): 42-44.
Wang Xuhui. Optimization of transportation system of half coal seam roadway in digging and blasting mining. CCI, 2016, 39(4): 42-44.