Combined with actual situation of Xingyuan Mine, No. 6 coal seam 6410 working face was adopted strip mining, in order to prevent water burst in working face, mechanical model of solid supported beam was used to calculate ultimate collapse distance of rock beam and critical mining length in fracturation, the mining width and width left in strip mining were settled and the strip mining plan was chosen.
刘会杰. 兴源矿6410工作面条带式开采煤柱留设宽度可行性研究[J]. 煤炭与化工, 2016, 39(1): 15-17,21.
Liu Huijie. Feasibility study of 6410 working face strip mining coal column width. CCI, 2016, 39(1): 15-17,21.