Xiaozhuang Mine is integrated, the underground mining condition is complex, with advanced coal seam not mining and upward mining difficulty. Based on the production of Xiaozhuang Mine, the roadway settlement was designed, and was promoted in many mining areas, with great success, improved the economic and social benefit.
李宗强. 上行开采工作面巷道布置方案设计[J]. 煤炭与化工, 2015, 38(11): 14-16.
LI Zong-qiang. Upward Mining Working Face Roadway Settlement Plan Design. CCI, 2015, 38(11): 14-16.