Based on actual recovery of deep large mining height super long working face, theory analysis combined with numerical simulation and measurement on site, 362.9 m long working face strata behavior features of Xieqiao Mine was analyzed. The result showed that first weighting interval was 39.56 m, periodic weighting length 12.48 m, close to theory analysis, during the pressure, tendency pressure of working face appeared with two pieces, three period with three peaks, and the reason was analyzed, which provided reference for similar condition of working face recovery.
唐永志,张学亮,李俊斌,李 群,韩先进,张 敏,张 浩. 深部大采高超长工作面矿压显现特征研究[J]. 煤炭与化工, 2015, 38(11): 10-13,16.
TANG Yong-zhi, ZHANG Xue-liang,LI Jun-bin, LI Qun, HAN Xian-jin,ZHANG Min,ZHANG Hao. Study on Deep Large Mining Height Super Long Working Face Strata Behavior Features. CCI, 2015, 38(11): 10-13,16.