1. China Coal Handan Design Engineering Corporation Ltd., Handan 056031, China; 2.Dadi Engineering Development Group Corporation., Ltd,Beijing 100102, China
Based on the large mines during the well yard layout problem, the layout of Danhou Mine auxiliary shaft wellhead automation circular yard was introduced,comparing with the same type of projects which had been put into operation the advantages and disadvantages of the layout of this automatic circular yard were described. The project proved that the Danhou Mine auxiliary shaft wellhead automation circular yard solved the mechanization, automation operation of large mine auxiliary shaft wellhead yard tramcar,shortened the turnaround time,improved the utilization rate of the mine car;in addition,it can also alleviate busy state of auxiliary shaft wellhead yard,reduce motor vehicles and personnel,improve the production efficiency and operation reliability,reduce operating costs and increase economic benefits.