Shenhua Xinjie Taigemiao Mine No.1 experiment inclined shaft project was taken as an example, TBM technology construction mine long distance, deep buried depth inclined shaft ventilation design was introduced. Based on ventilation standard, the air volume, air pressure, fan for air flow that inclined shaft construction needed were calculated, ventilation parameters were put forward, ventilation equipment selection was conducted. The detailed analysis ensured the ventilation design could meet the relative law and safe construction requirements.