|
| 2014, Vol. 37(3): 38-41 DOI: | ||
| Water Prevention and Control Technology of Shallow Depth Wellbore Construction under River | ||
| YANG Cheng, QIN Zu-jun, CHEN Zhao-sen, HU Xiu-qing, CAO Yong | ||
| Junlian Chuan Coal Furong Mining Industry Corporation Ltd., Junlian 645250, China | ||
| Received null Revised null | ||
| Supporting info | ||
null |
||
|