Abstract Based on Shigetai Mine 31304 main and auxiliary continuous mining working face bottom board argillization problem, through field observation and theoretical analysis, factors such as equipment roller compaction and water were the main reason to lead bottom board argillization intensify, measurements like water control, reasonable working procedure and low-lying broken point were adopted, which avoided bottom board argillization influence for construction and realized the rapid mining of the working face.
|