|
Abstract Hydraulic slippery rise template construction technique was applied to the ground silo and other projects in freezing shaft, double wall, rarely used in high strength concrete construction. Shanxi Linbei Mining Industry, through technical renovation, hydraulic slide template technique was adopted in the main shaft of wellbore construction process, compared with the ordinary template construction technique, with the advantages of no summer-planting seam, engineering quality, labor and material cost saving, better technical advantage, and provided the experience and reference for the similar conditions of engineering application.
|