|
Abstract In order to solve inclined hole causing drift problem, Beiguan Mine main inclined shaft adopted oblique freezing hole construction technology, which successfully solved the encountered in the excavation of quaternary unconsolidated aquifer alluvium, and greatly reduced the construction cost, and improved the driving speed, made the mine put into production early, accumulated useful experience for the similar construction.
|