| Coal Seam Mining through Collapse Column Mining Pressure Appearance Law Numerical Simulation Research |
| LI Bin1, ZHOU Qi-mou2, LIU Hu-sheng1 |
| 1. Bulianta Mine, Shenhua Shendong Coal Group, Erdos 017209, China; 2. School of Safe Engineering, North China Institute of Science and Technology, Beijing 101601, China |
|
|
|
|
Abstract Chengzhuang Mine KDX118 collapse column was taken as an example, according to geophysical exploration result, the expected poor water, without conduction KDX118 collapse column was conducted mining dynamic simulation. Through Flac3D numerical modeling, the mining zone damage situation and mining pressure stress change situation under mechanized caving working face though collapse column were shown. Stress concentration law when pushing collapse column was discussed, which recycled the coal resources as much as possible under safe mining and provided reference for optimizing working face. The observation result was used to conduct feasibility demonstration for the mine dealing with collapse column, which provided the technical reference for next production.
|
|
|
|
|
|
| [ 1 ] 项远法. 陷落柱突水力学模型[ J ]. 煤田地质与勘探,1993,21(5):36 - 39.[ 2 ] 尹尚先,武 强. 煤层底板陷落柱突水模拟及机理分析[ J ].岩石力学与工程学报,2004,23(15):2 551 - 2 556.[ 3 ] 李连崇,唐春安,梁正召. 煤层底板陷落柱活化突水过程的数值模拟[ J ]. 采矿与安全工程学报,2009,26(2):159 - 162.[ 4 ] 王家臣,杨胜利. 采动影响对陷落柱活化导水机理数值模拟研究[ J ]. 采矿与安全工程学报,2009, 26(2):140 - 144.[ 5 ] 贺志宏. 双柳煤矿陷落柱发育特征及突水机理研究[ D ]. 北京:中国矿业大学(北京),2012.[ 6 ] 孟 辉,马守君,樊海艳,等. 陷落柱影响采场围岩破坏的数值模拟分析[ J ]. 山东科技大学学报,2011, 30(5):26 - 35. |
|
|
|