| Working Face Partial Top Leaking Factors Analysis and Prevention Measures |
| ZHANG Qing-li, LI Lei, ZHENG Guo-ting |
| Xingtai Mine, Jizhong Energy Resources Corporation Ltd., Xingtai 054000, China |
|
|
|
|
Abstract According to top leaking in 7623 Xingtai Mine filling face, through analysis of geological conditions and the roof strata behavior regularity, combined with the actual production situation face, a number of management measures were taken, which got good economic benefits after practice.
|
|
|
|
|
|
| [ 1 ] 中国矿业学院等院校. 采煤学[ M ]. 北京:煤炭工业出版社,1981.[ 2 ] 钱鸣高,刘听成. 矿山压力及其控制[ M ]. 北京:煤炭工业出版社,1984.[ 3 ] 宁 宇. 大采高综采煤壁片帮冒顶机理与控制技术[ J ]. 煤炭学报,2009,34( 1 ):50 - 52.[ 4 ] 张顶立,何佐德. 综放工作面端面冒顶机理及控制[ J ]. 湘潭矿业学院学报,2001( 3 ):11 - 15. |
|
|
|