Abstract Based on the complicated mining problemof resources integrated mine, Kexing Nanyang Mine, as integrated mine after put into production, its 3208 working face was taken as an example, combined with No. 3 coal seam geological feature, the stopping working face design was conducted, equipment selection and construction technology were analyzed to achieve million tons of mine production requirement, which provided technical reference and expierence for similar condition.
|