|
Abstract Henan Coking Coal Energy Corporation, Jiulishan Mine 15051 mechanized working face ventilation roadway with the 20 m scope was taken as an example, foot step type hydraulic support design purpose, structure features, technical parameters and the use effect of underground were introduced, which served as a reference for the similar situation.
|