| Subsidence deformation characteristics of hard immediate roof in gob side entry retaining |
| Zhao Yang |
| Jizhong Energy Fengfeng Group Handan Baofeng Mining Co., Ltd., Jiulong Mine, Handan 056500, China |
|
|
|
|
Abstract In this paper, the structural form of direct roof subsidence under two limit conditions was analyzed, and the two-stage subsidence displacement model of roof was constructed. The FLAC3D software was used to simulate the two-stage subsidence form of roof and the stress law of roadside body under different goaf filling conditions. The simulation results showed that when the filling rate of goaf was reduced, the two-stage structural characteristics formed by roof subsidence were more obvious, and the vertical stress of coal wall and roadside body was higher. When the filling rate of goaf was low, the hard direct roof broke near the roadside body and large deformation occurred at the roadway. Finally, taking the engineering practice of Jiulong Mine as an example, the deformation of roadway surrounding rock under different filling rates was monitored and analyzed. The research results provided a reference for the surrounding rock control of gob-side entry retaining in filling mining.
|
|
|
|
|
|
| [ 1 ] 匡中文. 薄基岩地质条件下中厚煤层柔模混凝土沿空留巷矿压显现规律分析与应用[ J ]. 煤炭技术,2021,40( 11 ):66 - 69.
[ 2 ] 华心祝. 我国沿空留巷支护技术发展现状及改进建议[ J ]. 煤炭科学技术,2006( 12 ):78 - 81.
[ 3 ] 李乃录,易巧梅,张 恒,等. 风积沙与黄土混合固体充填材料物理力学特性研究[ J ]. 煤炭技术,2021,40( 5 ):20 - 24.
[ 4 ] 缪协兴,巨 峰,黄艳利,等. 充填采煤理论与技术的新进展及展望[ J ]. 中国矿业大学学报,2015,44( 3 ):391 - 399,429.
[ 5 ] 马立强,张东升,陈 涛,等. 综放巷内充填原位沿空留巷充填体支护阻力研究[ J ]. 岩石力学与工程学报,2007( 3 ):544 - 550.
[ 6 ] 邓五先. 大采深综采工作面充填留巷围岩稳定性关键技术研究[ J ]. 煤炭技术,2021,40( 2 ):1 - 4.
[ 7 ] 苗凯军,屠世浩,刘 迅,等. 深部厚硬顶板下充填面留巷大变形分析及控制[ J ]. 煤炭学报,2021,46( 4 ):1 232 - 1 241.
[ 8 ] 殷 伟,陈志维,周 楠,等.充填采煤沿空留巷顶板下沉量预测分析[ J ]. 采矿与安全工程学报,2017,34( 1 ):39 - 46.
[ 9 ] 龚 鹏. 深部大采高矸石充填综采沿空留巷围岩变形机理及应用[ D ]. 徐州:中国矿业大学,2018.
[ 10 ] 巨 峰,陈志维,张 强,等. 固体充填采煤沿空留巷围岩稳定性控制研究[ J ]. 采矿与安全工程学报,2015,32( 6 ):936 - 942.
[ 11 ] 权 凯,刘治成,徐向阳,等. 固体充填采煤沿空留巷顶板下沉力学机理研究[ J ]. 煤炭科学技术,2018,46( 3 ):33 - 38.
[ 12 ] 孙广京. 深井矸石充填工作面沿空留巷原理及围岩稳定性研究[ D ]. 长沙:湖南科技大学,2020.
[ 13 ] 邓雪杰,董超伟,袁宗萱,等. 深部充填沿空留巷巷旁支护体变形特征研究[ J ]. 采矿与安全工程学报,2020,37( 1 ):62 - 72.
[ 14 ] Sun Q, Zhang J, Huang Y, et al. ( 2020 )Failure mechanism and deformation characteristics of gob - side entry retaining in solid backfill mining: a case study. Natural Resources Research 29( 4 ): 2 513 - 2 527.
[ 15 ] 谢生荣,张广超,何尚森,等. 深部大采高充填开采沿空留巷围岩控制机理及应用[ J ]. 煤炭学报,2014,39( 12 ):2 362 - 2 368.
[ 16 ] 张吉雄,姜海强,缪协兴,等. 密实充填采煤沿空留巷巷旁支护体合理宽度研究[ J ]. 采矿与安全工程学报,2013,30( 2 ):159 - 164.
[ 17 ] 李 猛,张吉雄,姜海强,等. 固体密实充填采煤覆岩移动弹性地基薄板模型[ J ]. 煤炭学报,2014,39( 12 ):2 369 - 2 373. |
|
|
|