| Study on stress distribution and small coal pillar width of gob-side entry in Hongyuan Coal Industry |
| Han Junjun1, Li Xiaobin1, Zou Jianpeng1, Ma Haobin2 |
| 1. Shanxi Coal Import and Export Group Zuoquan Hongyuan Coal Industry Co., Ltd., Jinzhong 032600, China; 2. Henan Polytechnic University Henan Institute of Technology Industrial Technology Research Institute Co., Ltd., Jiaozuo 454003, China |
|
|
|
|
Abstract In order to improve the resource recovery rate, technology small coal pillars of gob-side entry was used in the return wind groove of No.15203 Face of Zuoquan Hongyuan Coal Industry. Through theoretical calculation and numerical simulation, the range of stress reduction zone after mining in the upper section of working face was mutually verified, and the width of coal pillar should not be more than 10 m. The numerical simulation and comparison of the plastic zone range and stress distribution of surrounding rock under different width coal pillar conditions were carried out. It was found that the vertical stress in the coal pillar with 6 ~ 8 m or 20 m width was lower than that in the coal pillar with 8 ~ 20 m width, and the plastic zone in the coal pillar with 6 ~ 8 m width was not completely connected. Combined with the actual production conditions, the width of the coal pillar was finally determined to be 7 m. Roadway support was anchor cable + bolt with metal mesh protection table. The cumulative deformation of coal pillar side was 288 mm, the cumulative deformation of coal mining side was 179 mm, the cumulative subsidence of roof was 168 mm, and the cumulative amount of floor heave was 676 mm.
|
|
|
|
|
|
| [ 1 ] 张百胜,王朋飞,崔守清,等. 大采高小煤柱沿空掘巷切顶卸压围岩控制技术[ J ]. 煤炭学报,2021,46( 7 ):2 254 - 2 267.
[ 2 ] 黄万朋,赵同阳,江东海,等. 双巷掘进留窄小煤柱布置方式及围岩稳定性控制技术[ J ]. 岩石力学与工程学报,2023,42( 3 ):617 - 629.
[ 3 ] 郝晓琦,韩 刚,解嘉豪,等. 鄂尔多斯矿区小煤柱沿空掘巷冲击地压机理[ J ]. 采矿与岩层控制工程学报,2023,5( 2 ):36 - 45.
[ 4 ] 高振东. 采空区侧向支承压力下沿空掘巷合理煤柱尺寸及围岩控制研究[ D ]. 包头:内蒙古科技大学,2023.
[ 5 ] 吕 风. 深部强动压软弱煤层沿空煤巷煤柱宽度及非对称控制研究[ J ]. 煤炭工程,2025,57( 1 ):120 - 128.
[ 6 ] 张仲达. 马泰壕煤矿窄煤柱沿空掘巷围岩控制技术研究[ D ]. 淮南:安徽理工大学,2024.
[ 7 ] 张雪峰. 沿空掘巷窄煤柱合理宽度及围岩控制技术研究[ J ]. 山西冶金,2023,46( 11 ):223 - 225.
[ 8 ] 侯朝炯,李学华. 综放沿空掘巷围岩大、小结构的稳定性原理[ J ]. 煤炭学报,2001( 1 ):1 - 7.
[ 9 ] 郭文兵,白二虎,赵高博. 高强度开采覆岩地表破坏及防控技术现状与进展[ J ]. 煤炭学报,2020,45( 2 ):509 - 523.
[ 10 ] 胡青峰,崔希民,刘文锴,等. 特厚煤层重复开采覆岩与地表移动变形规律研究[ J ]. 采矿与岩层控制工程学报,2020,2( 2 ):31 - 39.
[ 11 ] Mark C, Agioutantis Z. Analysis of coal pillar stability( ACPS ): A new generation of pillar design software[ J ]. International Journal of Mining Science and Technology, 2019, 29( 1 ): 87 - 91.
[ 12 ] 李 磊,柏建彪,王襄禹. 综放沿空掘巷合理位置及控制技术[ J ]. 煤炭学报,2012,37( 9 ):1 564 - 1 569. |
|
|
|