| Research and application of mine pressure control technology for double free island working face in extremely close distance coal seam |
| Yang Genghui1, Cheng Zhibin2, Wang Fan3, Li Jianguang1, Zhang Hanwen1 |
| 1. Lingshi Huayuan Coal Industry Co., Ltd., Lingshi 031300, China; 2. Henan Polytechnic Industrial Technology Research Institute Co., Ltd., Jiaozuo, 454003, China; 3. Henan Chuangrui Energy Technology Co., Ltd., Jiaozuo 454000, China |
|
|
|
|
Abstract In order to solve the problem of serious advance deformation of roadway in lower coal seam working face during the mining process of island working face in close distance coal seam, by analyzing the source of pressure, the dynamic pressure stress superposition of coal pillar, thick and hard roof and mining disturbance in upper coal seam mining led to serious advance deformation of roadway in lower coal seam. According to the analysis results, the control method of advanced roof cutting and pressure relief was put forward. The advance blasting pre-splitting was carried out in the upper coal seam mining roadway in advance to reduce the pressure influence of the lower coal seam mining roadway, so that the deformation of the roadway was reduced from the maximum 2.4 m to the maximum 0.8 m, which ensured the safety production of the working face.
|
|
|
|
|
|
| [ 1 ] 裴元成,魏启明,何 军,等. 不规则孤岛综放面应力场演变规律及破坏特征研究[ J ]. 中国煤炭,2023,49( 10 ):55 - 60.
[ 2 ] 邢世坤,李 辉,冯少华. 深部孤岛充填工作面沿空掘巷围岩偏应力演化与控制[ J ]. 河南理工大学学报(自然科学版),2024,43( 4 ):39 - 47.
[ 3 ] 董文卓,陈理强,王文杰,等. 上覆不规则煤柱孤岛工作面冲击地压弱结构法防治技术[ J ]. 矿业安全与环保,2024,51( 2 ):40 - 45,52.
[ 4 ] 田勇峰,曹东京,许宏阳,等. 切眼外错下孤岛工作面开采冲击危险性分析及防治措施[ J ]. 煤矿安全,2024,55( 3 ):139 - 146.
[ 5 ] 马 政. 孤岛综放工作面小煤柱沿空掘巷围岩控制技术研究[ J ]. 山东煤炭科技,2024,42( 3 ):1 - 4,15.
[ 6 ] 赵建兵,韩 浩,秦晓宏,等. 孤岛工作面区段煤柱留设及支护参数优化[ J ]. 陕西煤炭,2023,42( 4 ):74 - 78.
[ 7 ] 杨建新. 特厚综放孤岛工作面矿压显现及合理煤柱留设研究[ D ]. 淮南:安徽理工大学,2018. |
|
|
|