|
Abstract Based on the present situation of coal roadway mining and comprehensive tunneling production line in China, at present the problems existing in the production line of excavating in coal roadway was analyzed, from the analysis and comparison aspects of roadway drivage, supporting and production line equipment, excavating support modular integrated tunneling methods and research direction were put forward.
|