|
|
|
| Study on the development law of fracture zone in roof and floor of multi-coal seam composite mining |
| Liu Zhenpo, Yuan Peng |
| Huayuan Company Youzhong Coal Industry, Shandong New Mining Group, Jinzhong 045400, China |
|
|
|
|
Abstract Based on the fracture development of roof and floor of multi-coal seam composite mining in Youzhong Mine, theoretical calculation, numerical simulation and drilling measurement were used to study. The development height of roof caving zone in No.150202 Face was 40.11 ~ 63.09 m, 50.2 m and 54 ~ 57 m respectively, and the variation range of the three methods was basically the same. Combined with the geological conditions and research results of the mine, it could be concluded that the mining fracture zone of No.15 lower coal seam would not conduct the overlying No.3 and No.6 aquifers in the non-structural area, and there was a possibility of water conduction in the occurrence area of penetrating faults or collapse columns. Therefore, coal mine formulated the water prevention and control principle of ' geophysical prospecting first, drilling verification, structure investigation, upper prevention and lower mining ', which provided the basis for the production of related types of mines.
|
|
|
|
|
|
| [ 1 ] 陈松巍,继 霞,史博文. 基于差分法的覆岩“三带”高度与采动裂隙量化研究[ J ]. 现代矿业,2021,37( 12 ):149 - 152.
[ 2 ] 张 罡. 综合探测9105工作面导水裂隙带高度[ J ]. 江西煤炭科技,2020( 4 ):129 - 131.
[ 3 ] 岳 宁,李申龙,王怀顺,等. 侏罗系特厚煤层综放开采顶板导水裂隙带发育特征研究[ J ]. 煤炭工程,2023,55( 1 ):59 - 64.
[ 4 ] 王 旭,尹尚先,徐 斌,等. 综采工作条件下覆岩导水裂隙带高度预测模型优化研究[ J ]. 煤炭科学技术,2022:1 - 13.
[ 5 ] 白利民,尹尚先,李 文. 综采一次采全高顶板导水裂缝带发育高度的计算公式及适用性分析[ J ]. 煤田地质与勘探,2013,41( 5 ):36 - 39. |
|
|
|