Abstract Aiming at the problem of large deformation of peripheral rock in the roadway over the fault zone, difficult to control the failure of support, and unable to ensure the overall stability of the roadway, taking the roadway over the fault zone of Xinjing Company of Huayang Corporation as the engineering background, the destabilization and destruction mechanism of the roadway was analyzed according to the geological characteristics of the fault zone, and the all-anchor support technology was put forward, and verified by numerical simulation. The results of on-site engineering practice showed that under the optimized support scheme, the top and bottom plates of the roadway peripheral rock were shifted by 98 mm, the convergence of the two gangs was 85 mm, and the bottom bulge was 42 mm, and the deformation of the roadway peripheral rock was effectively controlled, which ensured the normal and safe production of the mine.
|
|
|
|
|
|
| [ 1 ] 牛俊伟. 巷道过断层安全支护技术分析[ J ]. 煤矿现代化,2017( 3 ):55 - 57.
[ 2 ] 那建勇. 掘进巷道过断层围岩支护技术研究[ J ]. 煤,2022,31( 12 ):63 - 65.
[ 3 ] 孟德龙. 沿空掘进拱形断面巷道过断层区域联合支护技术实践[ J ]. 山东煤炭科技,2023,41( 5 ):39 - 41.
[ 4 ] 程新春. 煤矿掘进巷道过断层破碎带支护技术[ J ]. 现代矿业,2017( 7 ):187 - 188.
[ 5 ] 王新兴. 巷道过断层破碎带支护技术[ J ]. 煤矿安全,2012,43( 10 ):83 - 85.
[ 6 ] 晁建伟,余同勇,韦四江. 回采巷道过断层顶板破坏特征研究[ J ]. 矿业安全与环保,2009,36( 2 ):13 - 15.
[ 7 ] 孟庆彬,韩立军,齐 彪,等. 复杂地质条件下巷道过断层关键技术研究及应用[ J ]. 采矿与安全工程学报,2017,34( 2 ):199 - 207.
[ 8 ] 梁和平. 锚注复合支护技术在巷道施工过大断层的应用[ J ]. 中国煤炭,2012,38( 11 ):34 - 36. |
| [1] |
Wang Chunrun1, Lei Xiaojing1, Li Zeteng2, Zhou Zixuan2, Chang Meiling2, Zhang Yong1, Chang Ming2,3, Wang Lixin2. Near infrared spectroscopic study on hydrogen bonding of arepidtan lotion[J]. CCI, 2024, 47(2): 149-156. |
|
|
|
|