| Technology innovation research on grouting treatment in fracture zone of fully mechanized face with
5.5 m large mining height |
| Duan Yunlong1, Ma Zhiyuan2, Zhang Chunwen1, Wu Chongfeng3, Wang Xueqing1 |
| 1. Yangquan Shangshe Coal Co., Ltd., Jinneng Holding Coal Group, Yangquan 045199, China; 2. Shijiazhuang Guosheng Mining Technology Co., Ltd.,Shijiazhuang 050035, China; 3. Taiyuan Coal Gasification Yinying Coal Industry Co., Ltd., Jinneng Holding Coal Group, Taiyuan 045011, China |
|
|
|
|
Abstract In view of the different characteristics of caving cavity and spalling range after exposing the fault in the 5.5 m thick coal seam of Shangshe Coal, the grouting materials with different performance indexes were used for comprehensive grouting treatment in different regions. In view of the special geological conditions such as thick exposed coal seam, large mining height ( ≥ 5.5 m ), easy spalling and roof fall, the grouting pressure and other parameters were dynamically optimized to adapt to the particularity of large mining height coal wall, adjust the technical parameters such as grouting sequence, and control the extension range of disasters in fully mechanized mining face. The application results showed that the integrity of the coal wall of the working face was enhanced, the loose coal and rock mass was consolidated and compacted, and the roof beam of the support quickly constructed the regenerated cemented false roof support layer, which enhanced the destructive impact of the roof re-caving on the working face support, and created a safe working environment for the timely moving support operation after the shearer drum cutting. The application prospect of this process was broad, and the economic and social benefits were obvious.
|
|
|
|
|
|
| [ 1 ] 崔志强. 工作面过陷落柱软弱顶板管棚加固技术研究[ J ]. 煤矿现代化,2020( 2 ):35 - 37.
[ 2 ] 刘凤鸣. 固特珑注浆材料在综采面过断层中的应用[ J ].能源与节能, 2014( 12 ):182 - 183.
[ 3 ] 马国学. 煤岩体化学注浆加固技术应用研究[D]. 北京:中国矿业大学(北京),2007. |
|
|
|