|
|
|
| Study on the development of water conduction fracture zone in No.201 face of Jinxinda Coal Industry |
| Gao Ganggang |
| Jinxinda Coal Industry Shanxi Coking Coal Fenxi Mining Group, Linfen 041000, China |
|
|
|
|
Abstract This paper took the prevention and control of roof water damage in No.2 coal seam of Jinxinda Mine as the research background. Considering the topography, coal seam occurrence characteristics and mining technical conditions of the mining area, the spatial occurrence structure and groundwater characteristics of aquifer and aquiclude in the process of coal seam mining were analyzed. The types and basic characteristics of mine water damage were clarified. A variety of measurement methods were used to determine the stable height and maximum height of the water conduction fracture zone, and the dynamic change law of the water conduction fracture zone was analyzed to guide the safe production of coal mines.
|
|
|
|
|
|
| [ 1 ] 马鹏程. 工作面导水裂隙带高度实测技术应用[ J ]. 煤炭与化工,2021,44( 11 ):39 - 41.
[ 2 ] 郑文贤,刘一龙,啜晓宇,等. 煤层重复采动条件下覆岩移动规律数值模拟研究[ J ]. 煤炭与化工,2020,43( 9 ):1 - 5,9.
[ 3 ] 张宏志. 综采工作面覆岩导水裂隙带高度研究[ J ]. 煤炭与化工,2019,42( 2 ):58 - 60. |
|
|
|