| Transformation development and application of gangue filling scraper conveyor |
| Li Yaxiong |
| Xingdong Mine, Jizhong Energy Co., Ltd., Xingtai 054000, China |
|
|
|
|
Abstract Due to the footage of rock roadway, roadway renovation and raw coal screening, a large amount of gangue will be produced. In order to protect the environment, prevent land subsidence and protect the surface attachments and ground buildings, the gangue under Xingdong Mine does not rise to the well, and the gangue mountain is not set up on the ground. All the gangue produced in the production process is used for underground filling. In order to solve the problem of gangue treatment, the mine specially designed the gangue filling working face to ensure the gangue filling rate to meet the production demand. The existing equipment was used to redevelop the gangue filling scraper conveyor. After the upgrading and transformation, the SGZC900/400 gangue filling scraper conveyor increased the transportation capacity to 656 t/h, increased the output by 1.87 times, and ensured the monthly output requirements of Xingdong Mine.
|
|
|
|
|
|
| [ 1 ] 张普田. 煤矿矸石充填开采地表变形规律分析[ J ]. 矿山测量,2009( 4 ):29 - 30,40.
[ 2 ] 张 新. 矸石充填刮板输送机的设计与应用[ J ]. 矿山机械,2012( 2 ):117 - 118.
[ 3 ] 郭 波. 煤矿充填开采工作面充填刮板输送机技术研究[ J ]. 煤炭科技,2018( 3 ):61 - 63. |
|
|
|