|
|
|
| Study on Characteristics of Collapse Column and Optimization of Mining Scheme in Gequan Mine |
| Liu Yinbo |
| Gequan Mine of Jizhong Energy Resources Group Co., Ltd., Xingtai 054100, China |
|
|
|
|
Abstract In order to ensure the safety of working face in the process of mining, laboratory analysis and numerical simulation were used to study the characteristics of collapse column and mining optimization in Gequan Mine. Sampling in the collapse column, laboratory analysis showed that the collapse column of Gequan Mine had the characteristics of dense internal structure, high cementation, common scratches and traction near the contact surface, and clear interface. The numerical simulation showed that the outlet water of collapse column working face was closely related to the change of ground pressure during mining. A certain width of protective coal pillar should be set for the collapse column in the working face, but after grouting reinforcement was carried out around the collapse column, the scheme of direct mining could be adopted to achieve safe production.
|
|
|
|
|
|
| [ 1 ] 张勃阳,白海波,张 凯. 采动影响下陷落柱的滞后突水机理研究[ J ]. 中国矿业大学学报,2016,45( 3 ):447 - 454.
[ 2 ] 赵金贵,郭敏泰. 平顺老马岭岩溶陷落柱的发现及形成时段探讨[ J ]. 煤炭学报,2014,39( 8 ):1 716 - 1 724.
[ 3 ] 石宁飞. 陷落柱影响巷道围岩变形破坏规律及支护对策[ J ]. 煤炭与化工,2020,43( 4 ):22 - 26.
[ 4 ] 宁建宏,张广忠. 陷落柱的地震识别技术及其应用[ J ]. 煤田地质与勘探,2005,33( 3 ):64 - 67.
[ 5 ] 尹尚先,连会青,刘德民,等. 华北型煤田岩溶陷落柱研究70 年: 成因·机理·防治[ J ]. 煤炭科学技术,2019,47( 11 ):1 - 29.
[ 6 ] 王经明,刘文生,关永强,等. 华北煤田陷落柱的地下水内循环形成机理:以峰峰矿区为例[ J ]. 中国岩溶,2007,26( 1 ):11 - 17.
[ 7 ] 刘德民,曹代勇. 华北型煤田陷落柱发育程度的模糊综合评价研究[ C ]//中国煤炭学会矿井地质专业委员会2008年学术论坛文集.徐州:中国矿业大学出版社,2008. |
|
|
|