|
|
|
| Deformation mechanism and countermeasures of prevention and control of complex mining side slope in Xingren City |
| Li Chong,Yang Bin,Zhang Xiaotao |
| Third Hydrogeological Team, China Coal Geological Administration, Handan 056001, China |
|
|
|
|
Abstract Through the analysis of the complex topography, geological conditions, external influencing factors and deformation mechanism of the Laoyingshan side slope in Jichangping Village, Panjiazhuang Town, Xingren City, Guizhou Province, it was clear that the side slope formed a potential super-large traction landslide under the influence of coal seam mining in the lower part of the mountain and the external dynamic conditions of long-term rainfall, The side slope was currently in the ' ladder ' creep cracking to shear deformation stage to the sliding surface penetration stage, which was in an unstable-basic stable state. Under abnormal conditions such as heavy rain, it was possible to form a large area of overall decline. In view of this situation, two kinds of prevention and control countermeasures were put forward, namely, ' monitoring and forecasting + relocation and avoidance ' non-engineering measures and ' eliminating side and reducing load + intercepting drainage ditch and drainage corridor ' engineering measures.
|
|
|
|
|
|
| [ 1 ] 马 超. 岔角滩井田二采区采动对边坡稳定性影响及防治对策研究[ D ]. 西安:西安科技大学,2017.
[ 2 ] 樊克恭,景春元,牛盛名,等. 不同倾角采动边坡移动变形特征及稳定性分析[ J ]. 煤矿安全,2020,51( 3 ):231 - 234.
[ 3 ] 王 越. 基于数值模拟的采动滑坡变形机理研究[ J ]. 华北国土资源,2018( 5 ):22 - 25.
[ 4 ] 丁鑫品,王振伟,李 伟. 采动边坡失稳的动力过程及典型变形破坏机理[ J ]. 煤炭学报,2016,41( 10 ):2 606 - 2 611.
[ 5 ] 何姣云,张世雄. 露天矿不采区边坡位移监测及滑坡预报研究[ J ]. 矿业安全与环保,2006,33( 6 ):35 - 37.
[ 6 ] 石玉泉,付培义. 矿山GPS沉陷与变形监测体系[ J ]. 太原理工大学学报,2003,34( 2 ):166 - 168,177.
[ 7 ] 郑国忠,徐嘉谟,马凤山,等. GPS技术在金川露天矿边坡变形监测中的应用[ J ]. 工程地质学报,1998( 3 ):282 - 288.
[ 8 ] 阴晓冬. 地下采动作用下岩质边坡变形破坏机理研究[ D ]. 西安:长安大学,2018.
[ 9 ] 贾林刚. 露天矿开采影响下的地表移动变形的模拟预测研究[ D ]. 北京:煤炭科学研究总院,2006.
[ 10 ] 徐杨青,吴西臣. 复合采动边坡变形机理及稳定性评价[ J ]. 工程地质学报,2011,19( 4 ):594 - 600. |
|
|
|