|
Abstract Through the study of formation mechanism of goaf gas enrichment area of overburden in Chengzhuang Mine, the arrangement parameters of goaf roof high drilling was settled, using directional and ordinary rig, goaf gas enrichment area construction high drilling and goaf gas extraction were conducted, which provided reference basis for similar conditions of extraction.
|