| Support design and application of 15301 return air roadway through fault broken zone |
| Xu Liujun |
| Shanxi Xincun Coal Industry Co., Ltd., Changzhi 046000, China |
|
|
|
|
Abstract During the period of Xincun Coal Industry15301 return air roadway passing F19 fault, the fault fracture zone was exposed, the roadway support was difficult, and the ore pressure was obvious, which brought great hidden trouble to the safe use of roadway in the subsequent mining period.Based on the advanced detection and verification analysis of F19 fault, combined with the actual geological conditions of the site, the advanced pipe shed intensive roof and pre-grouting were used to control the roof fracture zone within the influence range of the fault, and the combined support of anchor net and cable shotcrete was used to strengthen the support of the surrounding rock of the roadway.The practice showed that the support design could effectively control the deformation of roadway surrounding rock, and met the safety tunneling needs of 15301 return air roadway through fault fracture zone and the use requirements of roadway during mining of 15301 working face.
|
|
|
|
|
|
| [ 1 ] 张 鹏. 掘进巷道遇断层冒顶处理技术[ J ]. 江西煤炭科技,2020( 1 ):155 - 157.
[ 2 ] 李小龙. 煤巷掘进锚杆注浆超前支护过断层破碎带实践[ J ].
江西煤炭科技,2017( 4 ):69 - 71.
[ 3 ] 宋宗武. 深井工作面侧向支承压力分布规律及区段煤柱留设研究[ D ]. 青岛:山东科技大学,2017.
[ 4 ] 马龙涛. 主运输巷道壁后注浆加固实践[ J ]. 陕西煤炭2016,35( 5 ):112 - 114. |
|
|
|