| Study on key parameters of gob-side entry retaining with roof cutting and pressure relief in Zhuangzihe Coal Industry |
| Li Qing |
| Zhuangzihe Coal Industry, Shanxi Jiaomeishanmei International , Changzhi 047100, China |
|
|
|
|
Abstract In order to improve the recovery rate of coal resources in Zhuangzihe Coal Industry, it is decided to implement the roof cutting and pressure relief self roadway technology in 15106 working face. Through theoretical analysis and numerical simulation, it is determined that the reasonable roof cutting height is 9 m and the roof cutting angle is 15°. According to the roof cutting parameters and the actual engineering geological conditions of the working face, the reinforcement support scheme of the retained roadway section is proposed. The field application results show that after the implementation of roof cutting and pressure relief technology, the overall stability of the surrounding rock in the retained roadway section is good, which can meet the normal production requirements of the working face.
|
|
|
|
|
|
| 1 ] 陈上元,何满潮,郭志飚,等. 深部沿空切顶成巷围岩稳定性控制对策[ J ]. 工程科学与技术,2019,51( 5 ):107 - 116.
[ 2 ] 张 勇,申付新,孙晓明,等. 三软煤层切顶成巷二次复用围岩应力及变形演化规律[ J ]. 中国矿业大学学报,2020,49( 2 ):247 - 254.
[ 3 ] 王亚军,何满潮,杨 军,等. 无煤柱自成巷“短臂梁”结构特征及变形计算分析[ J ]. 中国矿业大学学报,2019,48( 4 ):718 - 726,759.
[ 4 ] 杨 军,王宏宇,王亚军,等. 切顶卸压无煤柱自成巷顶板断裂特征研究[ J ]. 采矿与安全工程学报,2019,36( 6 ):1 137 - 1 144. |
|
|
|