|
|
|
| Study on Coalfield 3 d Seismic Exploration Construction in Jiulongchuan Mine |
| GANG Qiang1, HU Zong-zheng1, HU Xiao-dong2 |
| Geophysical Prospecting and Surveying Team, China National Administration of Coal Geology, Xingtai 054000, China; 2. China Coal Huasheng Geological Engineering Supervision Corporation Ltd., Handan 056201, China |
|
|
|
|
Abstract Through analyzing the whole construction and the final results, the research showed that the loess structure, coal thickness, structure and regional structure, the selection of construction parameters and the performance of the instruments and construction season affected 3 d seismic exploration results in Gansu Ningzhong Jiulongchuan Mine.
|
|
|
|
|
|
|
|
|