| Thick coal seamPile shotcrete along the empty laneTechnical research and application |
| Han Hongbing |
| Xin’an Mine, Jizhong Energy Fengfeng Group, Handan 056200, China |
|
|
|
|
Abstract In order to improve the coal recovery rate and prolong the service life of Xin’an Mine, the gob-side entry retaining was implemented in the transportation roadway of No.11212 - 2 Face. The length of the gob-side entry retaining was 770 m by the technology of “ pile-spraying concrete gob-side entry retaining ”. The combined support of advanced roof cutting and pressure relief + reinforced anchor cable + wall near the pile-spraying roadway was adopted. The jet grouting technology was a new method to build concrete wall. The sand and stone, cement and JCT-1 jetting concrete admixtures were mixed in a certain proportion under wet conditions to spray into the wall. The wall near the jet grouting concrete roadway played the role of isolating the goaf and supporting the roof of the roadway, which provided high strength support for the roof of the roadway in time. The application results showed that the technology had good roadway formation effect, achieved the goal of safety, efficiency and gob-side entry retaining, and had wide adaptability and popularization.
|
|
|
|
|
|
| [ 1 ] 柏建彪,侯朝炯. 深部巷道围岩控制原理与应用研究[ J ]. 中国矿业大学学报,2006,2( 35 ):145 - 148.
[ 2 ] 郭育光,柏建彪,侯朝炯. 沿空留巷巷旁充填体主要参数研究[ J ]. 中国矿业大学学报,1992,21( 4 ):1 - 11.
[ 3 ] 李化敏. 沿空留巷顶板岩层控制设计[ J ]. 岩石力学与工程学报,2000,19( 5 ):651 - 654.
[ 4 ] 漆泰岳,郭育光,侯朝炯. 沿空留巷整体浇筑护巷带适应性研究[ J ]. 煤炭学报,1999,24( 3 ):256 - 260.
[ 5 ] 谢文兵,笪建原,冯光明. 综采沿空留巷围岩控制机理[ J ]. 中南大学学报,2004,35( 4 ):657 - 661.
[ 6 ] 朱川曲,张道兵,施式亮,等. 综放沿空留巷支护结构的可靠性分析[ J ]. 煤炭学报,2006,31( 2 ):141 - 144.
[ 7 ] 华心祝,马俊枫,许家教. 沿空留巷旁锚索加固支护与参数优化[ J ]. 煤炭科技学术,2005,24( 12 ):2 107 - 2 112. |
|
|
|